Design Time vs. Admin Overheads: How to Win the Battle by Closing the Gaps

Design Time vs. Admin Overheads: How to Win the Battle by Closing the Gaps

Menu

No more distractions, please! 45% of our time is already spent on admin. If you’re the average engineer, that is.

Techconsult, a German-based analyst firm has just found that almost half of the engineering time of any manufacturing company is spent feeding systems and re-entering data. So it’s no surprise that economists are scratching their heads trying to explain why productivity is declining, despite constantly increasing investments in IT systems.

Complexity stunts productivity

We asked Techconsult to look into this, so they spoke to more than 150 engineering managers to find out where the problem lies. The answer: The complexity of products and processes is increasing, putting engineering productivity under pressure. Design re06use seems to be a viable solution, but the managers doubt that the available systems will help them.

This is bad news – but it gets worse. In the information age, the common cure for any problem is to throw a piece of software at it. In the case of engineering, the consensus was: Map the product development process in a system, manage the design data, and this will solve the issue. But the survey data doesn’t bear this out, finding that 77% of engineering decision-makers expect to gain no positive productivity effects from a PLM system.

Admittedly, I’m not surprised by this outcome (though I was expecting a little more positivity). But it is completely in line with my day-to-day customer experience. From the Zuken perspective, it has always been an issue that the workflows and requirements of electrical and electronics engineering were not covered by PLM systems, opening a dangerous gap where there should be a seamless cross-discipline flow of design data and process information.

The good news

So, is there any good news here? There is, and it comes in a clear statement from the engineering managers surveyed by Techconsult: 78% believe there is value in dedicated design data management for electrical and electronics engineering, tightly integrated with a PLM system (and equally tightly integrated into the ECAD system, I would add). This is what we call domain data management at Zuken. It’s just a fancy term for electrical and electronics engineers managing their own data and workflow from within their own tools. It’s something we’ve been doing for electronics engineers for a long time, but now we’re making it truly cross-discipline by adding a dedicated tool for electrical engineers, with DS-E3.

We knew the need was there, and we had an idea that companies were beginning to understand where the gaps lay in their systems, but as Robert Heinlein said: “Being right too soon is socially unacceptable.” I guess the time for domain data management has come. Finally.

Find out more at www.zuken.com/edm or watch our new movie

Thomas Gessner
Thomas Gessner
Business Development Manager
Thomas Gessner is responsible for the business development of Zuken's MBSE solutions. Together with solution partners and technical experts, he helps build solutions that enable customers to achieve product success. His experience spans 35 years in product development software and methods.
high-speed-pcb-design-zuken-us-1510x731-1-510x310
  • Webinar
July 29, 2024
Mitigate the Challenges of Stack-Up Design and Track Impedance Control in a Cooperative Manner

In this Webinar, an optimized PCB design flow combining Zuken CR-8000 technology working tightly with stackup optimization capabilities provided by Polar Speedstack ™ will be presented.

Live Webinar
September 10th - 11am CEST / 10am UK
Reuse of Schematic and Layout Modules in PCB design
  • Webinar
April 12, 2024
Dealing with Component Obsolescence in PCB Design

This webinar will demonstrate how Zuken's CR-8000 Enterprise PCB Design System automates updates and redesigns in response to component obsolescence. Learn how to identify affected modules, update designs with a schematic module library, and intelligently assist layout modifications.

Watch On-Demand
Haulotte's integration of E3.series with ARAS PLM, highlighting improved engineering processes, efficiency, error reduction, and PLM integration, supporting Haulotte's innovation and success in aerial work platforms.
  • Case Study
January 16, 2024
Haulotte

Haulotte's choice of Zuken's E3.series solution has enabled the optimization of work methodology and a more serene and effective projection towards future developments

Read now
The integration of the E3.Series and DS-E3 solutions with the ARAS PLM fully meets the needs expressed by the engineering department at Haulotte.
pizzato-headquater-510x310
  • Case Study
May 26, 2023
Pizzato Elettrica

Working in safety - this is the value proposition of Pizzato Elettrica, a well-established industrial safety company based in Marostica, Italy, which has chosen Zuken to implement a solution that integrates its electronic design environment with the company's PDM infrastructure.

Read now
Integrating electronic design environment within the company's PDM infrastructure.