Tech Tip: Managing BOMs Through the Component EOL Cycle with Zuken’s DS-CR
Menu
The Problem
Electronic components are constantly changing, causing parts to go EOL (End-of-Life) for various reasons: companies go out of business, component product lines change hands, new technology replaces old technology. Correspondingly, electronic product manufacturers must be agile to keep their product BOMs (bill of materials) up-to-date and their supply chain humming. Fortunately for them, Zuken’s DS-CR customers leverage component and design data relationships to tackle the problem.
Three steps to mitigate EOL parts and update the BOM
Let’s go through the steps of identifying troublesome EOL parts, finding a replacement part, and updating the BOM to reflect necessary changes.
Step 1: Knowledge that a part is scheduled for EOL
Before you can manage it, you need to know when a part is approaching EOL status. One approach is a parts data service such as Silicone Expert ®. Silicone Expert paired with DS-CR automatically updates your component master with part lifecycle data, including EOL status!Then it is easy to identify EOL parts that need replacements.
Step 2: Identify and qualify a replacement
The first place to look for a potential replacement part is in your company’s component master. Ideally, you’ll find a suitable part already qualified and ready to use. DS-CR’s parametric search capability lets users scan the entire component master by part category, operating characteristics, compliance factors, and many other parameters to find a part that meets specific criteria.
If a component master match isn’t found, then you’ll turn to a parts search service to find your new part.Silicone Expert has excellent search features, and part properties can be imported from Silicone Expert into DS-CR to save the time-consuming, error-prone manual entry. Download a datasheet, attach it to the part and submit it for processing using the New Part Request form.
S-CR provides workflow capabilities so a new part is guided through the qualification process without missing any steps, it includes review/approval checkpoints that ensure unapproved parts aren’t included in a production BOM.Workflow status is tracked and visible in the component master and BOM views. As a result, everyone that needs to know is informed throughout the process.
One-to-one or AVL
At this point, we should discuss the two common strategies for assigning manufacturer’s parts to company part numbers: One-to-one and AVL (Approved Vendor List).
As the name implies, one-to-one relates a company part number to one manufacturer’s part. Substitute parts must be defined with an “alternate” relationship.This adds complexity for parts at EOL because all BOMs with the EOL part must be updated to effect the change. Fortunately, DS-CR handles alternate relationships between parts and the BOM change process very elegantly.
The AVL strategy allows a company part to have a list of several manufacturer’s parts that are equivalent. Each part must have the same physical dimensions and equivalent operational characteristics. A big advantage of this approach is that the manufacturer’s parts can be added and removed from the AVL to address EOL issues without having to update the BOMs containing the part.DS-CR has AVL relationships built into its data model—tracked by change management workflows—and configurable interfaces to PLM and ERP systems to sync AVL updates between systems. This image shows a company part with two manufacturers’ parts in its AVL.
Step 3: Update product BOMs, PLM, and ERP systems to reflect the changes
DS-CR’s CLM (Component List Manager) module is used to prepare and validate BOMs for production. It imports parts information from schematics, PCB layouts, and even CSV files. It provides full visibility to all component properties, including lifecycle status (i.e. EOL) and workflow status (i.e. approved). This information is used to ensure all parts are compliant with the company’s supply chain policies. It also highlights issues that need to be addressed before the BOM is released.
Alternate part relationships defined in the component master are used to conveniently swap out EOL parts with compatible substitutes. Parametric search and replace features allow the user to make ad hoc swaps if needed. BOM changes are subject to a review and approval process using DS-CR’s change management workflows. The final BOM is retained in a vault under revision control with check-in/out features to track its history.
BOM information is used for production and supply chain planning, so it must be shared with a company’s PLM and ERP system.The previously mentioned PLM and ERP interface capability is configurable to send this information where it is needed to support production business processes.
Summary
The key takeaways are:
Maximize the use of the data available to identify EOL parts and find suitable replacements.
Modern design automation can ease the burden of managing changes and propagating data updates needed to support business processes.
Zuken’s DS-CR platform maximizes the value of all the part and design data by linking their sometimes-complex relationships together.
Tom Warneke
Tom Warneke is an Applications Engineer supporting Zuken’s DS-CR platform for electronics product design. Previous experience includes managing engineering and supply chain management systems for electronics manufactures and product management for EDA software suppliers.