Resources by

Stay on the leading edge of PCB, electrical and data management technologies

32 results found
Bruker-s8-lion-feature-510x310
  • Case Study
novembre 22, 2018
Bruker
Case Study, Bruker, E3.cable, Multi-disciplinary collaboration, Manufacturing and Service Documentation
raises documentation quality and design flow efficiency for precision instrumentation with E3.series.
Stone Aerospace - Testing Autonomous Underwater Vehicle
  • Case Study
novembre 21, 2018
Stone Aerospace
Case Study, Stone Aerospace, Augmenter la productivité, Réduction du coût total des produits, Contrôle de la qualité par l’automatisation et la vérification
Reduce cabling design time by 12 weeks through using E3.series
EmergencyOne-fire-engine-510x310
  • Case Study
novembre 21, 2018
Emergency One
Case Study, Emergency One, E3.cable, E3.formboard, Wire Harness Engineering, Construction modulaire
controls wire harness design complexity and slashes delivery lead times by using a digital design process.
ATK-MCAD2-510x310
  • Case Study
novembre 21, 2018
ATK
Case Study, ATK, Augmenter la productivité, Contrôle de la qualité par l’automatisation et la vérification, 3rd Party Integration
increases cable design productivity for space shuttle booster replacement by moving to a digital design process.
Arm-Automation-Closeup-of-panel-feature-510x310
  • Case Study
novembre 21, 2018
ARM Automation
Case Study, ARM Automation, Augmenter la productivité, Complexité des produits et des processus
achieves two-thirds electrical design time reduction and increases project ROI.
Alstom-CORADIA-Continental-für-Augsburg-510x310
  • Case Study
novembre 21, 2018
Alstom
Case Study, Alstom, E3.cable, Augmenter la productivité, Construction modulaire
improves productivity and planning by adopting a modular methodology for electrical design.
mueller-martini-Alegro_Schrank-510x310
  • Case Study
novembre 15, 2018
Müller Martini
Case Study, Müller Martini, Augmenter la productivité, Options and Variants, Multi-site collaboration, ERP/PLM Integration, Construction modulaire, Electro-Mechanical Cabinet Design, Multi-disciplinary collaboration
enhances variant and option handling and reduces manufacturing costs by moving to an object-oriented ECAD environment.
Mecalac
  • Case Study
novembre 15, 2018
Mecalac
Case Study, Mecalac, E3.formboard, Wire Harness Engineering, Special Vehicles, Gestion du changement, Restructuration du processus de développement de produits, Multi-disciplinary collaboration
cuts the time taken to develop right-first-time cable harnesses for its heavy plant vehicles.
Pantec-RHINO-II-machine-510x310
  • Case Study
novembre 12, 2018
Pantec Automation
Case Study, Pantec Automation, Augmenter la productivité, Assurer la réactivité de l’entreprise, Options and Variants, Construction modulaire, Gestion de la configuration, Multi-disciplinary collaboration
cuts machine manufacturing turnaround time by around 50%, reduces product costs, and helps protect IP for its customers.
BCA-Leisure-Test-510x310
  • Case Study
novembre 08, 2018
BCA Leisure
Case Study, BCA Leisure, Special Vehicles, ERP/PLM Integration, Multi-disciplinary collaboration, Réduction du coût total des produits
Using E3.series to design and manufacture cable harnesses for caravans and motorhomes
KRONE integrates ECAD, MCAD and ERP to enable integrated design and sourcing
  • Case Study
octobre 10, 2018
Krone
Case Study, Krone, Contrôle de la qualité par l’automatisation et la vérification, Digital Twin, Wire Harness Engineering, ECAD/MCAD Integration, Special Vehicles, Industry 4.0, Electrical Planning and Documentation
Krone Agricultural Machinery integrates ECAD, MCAD and ERP to enable integrated design and sourcing
endress-hauser-production-550x342-510x310
  • Case Study
octobre 01, 2018
Endress+Hauser
Case Study, Endress+Hauser, Design Force, Augmenter la productivité, Construction modulaire, Machines, Restructuration du processus de développement de produits
Endress+Hauser standardizes PCB engineering and production processes for industrial measurement products across distributed locations
toshiba-transfer-jet-813x492-510x310
  • Case Study
septembre 26, 2018
Toshiba
Case Study, Toshiba, PCB Design in Context, Verification and Validation, Multi-disciplinary collaboration
significantly reduce product size with 3D chip, package, board co-design.
new-TCC-unit-510x310
  • Case Study
juin 25, 2017
BAE Systems
Case Study, BAE Systems
BAE Systems uses CADSTAR to help reduce turret control computer wiring by 98%
tam640_bare_board2-optimized-510x310
  • Case Study
novembre 22, 2014
TEWS
Case Study, TEWS
TEWS significantly reduces development time and cost of complex high-speed PCBs using concurrent power integrity simulation.
panalytical-1280x630-510x310
  • Case Study
avril 25, 2011
Malvern Panalytical
Case Study, Malvern Panalytical
enhance data collaboration between ECAD and MCAD, improving manufacturing data.